Parameter setting
You need to set the following parameters in the "Mission Planner" full parameter list:
- BATT_MONITOR=4
- BATT_VOLT_PIN=12(ADC6.6)
- BATT_VOLT_MULT=18(Voltage division ratio of the power module, taking HV_PM as an example)
- BATT_CURR_PIN=13(ADC3.3)
- BATT_AMP_PERVLT=24(A/V,taking HV_ PMW as an example)

If there is a slight difference between the monitored voltage and the actual battery voltage, you can manually change the measured battery voltage to the actual battery voltage.
